Whether you build new homes or specialize in remodeling existing homes, installing a Central Vacuum System usually takes only a few hours and a few simple steps.
In New Construction Determine inlet valve locations. Run PVC pipe and low voltage (24V) wiring from the inlets to the power unit (after plumbing and electrical work is completed and before wallboard is installed). Then mount the power unit.
In Existing Construction Determine locations for inlet valves. Then run PVC pipe and low voltage wiring through the basement, attic or crawlspace to the power unit. (In multi-story homes, piping may be run to upper levels through the backs of closets, under stairways, beside soil pipes.) There's little or no damage to walls and practically no mess. Then mount the unit.
|